Adding more lights and running in the electrical cables.
All 6 lights wired in. Loads of light given off by them. I'm very pleased with it.
Saturday morning, time to hang the door.
Will be getting more wood for the door, need more of the same wood and some other bits, so will be making a list of the final finishing bits.
Nice Sturdy lock fitted with big coach bolts.
Prepping the floor.
First board going down.
Sunday, the day to get working on the floor.
Almost there.
Nipped out to Mustang gathering to see Chris WRX with the new renegades Hoodie. On the way back popped into Wickes to get some Celotex. I have loads of loft insulation left over, but don't want to have it too low to the ground. So installing Celotex low down and loft insulation higher up. At 4:17 a sheet and each sheet is 0.5m2, I would need (2.1X1.80)*(3.5*1.8)*2 = 30m2. So 60 sheets. £250, so just invested £65 as this will be enough to do the low down parts.
Now to start putting some panelling on.
Looking Awesome
All 6 lights wired in. Loads of light given off by them. I'm very pleased with it.
Saturday morning, time to hang the door.
Will be getting more wood for the door, need more of the same wood and some other bits, so will be making a list of the final finishing bits.
Nice Sturdy lock fitted with big coach bolts.
Prepping the floor.
First board going down.
Sunday, the day to get working on the floor.
Almost there.
Nipped out to Mustang gathering to see Chris WRX with the new renegades Hoodie. On the way back popped into Wickes to get some Celotex. I have loads of loft insulation left over, but don't want to have it too low to the ground. So installing Celotex low down and loft insulation higher up. At 4:17 a sheet and each sheet is 0.5m2, I would need (2.1X1.80)*(3.5*1.8)*2 = 30m2. So 60 sheets. £250, so just invested £65 as this will be enough to do the low down parts.
Now to start putting some panelling on.
Looking Awesome