Created a new blog for my garden project

Thanks Darren.

The shack has vertical posts now. Going well. So most of the frame done, will be adding diagonals in the frame in the morning. Then can remove the supports. I think by early afternoon I'll be adding tongue and groove tot he sides where the walls are.
 
Come on don't forget the pictures you know that daz needs to make sure you are building it correctly and that it's up to the welsh standard. Are you planning on sheep???lol
 
Sheep pen coming along well.
IMAG3205.jpg
 
Are that's right he's building his sheep sheering hut opps that's me lol, Nice tidy work site HSE would be proud of that apart from where is the big sign telling you what you can cant do must wear lol,
 
Coated a bit more yesterday evening, and also added the other slope frame on the roof.
IMAG3325.jpg
 
Not long now till 5pm, then I'll be outside working on this before it gets dark :)
 
where is your helper ?? going well at the moment . so with this much planning and thought for the love shack the new garage will be a palace for the TA
 
Wow, the sterling boards 2440x1220x18mm are blooming heavy lifting over your head to slide onto the roof supports.
IMAG3337.jpg
Got the 4 whole ones up there. These will be slid to the middle. And smaller ones added around the edge.
 
Added more to the blog. Its coming along well.
attachment.php
 
should have it finished by next weekend ?

I do have Friday off, so depending on weather I can get a full day on it. Also I'm hoing for dry weather this evening, as its the only evening this week I get in at 5:10pm and can work on it till dark. I may even get all the panels on the window side fitted tonight.
 
IMAG3365.jpg
Got the panelling on to the right hand side of the window. Just a few screws. All screwed in, and fished coating this new bit inside and out. Ran out of light. Got 2 hours on the shed this evening.
Wood is cut for the left hand side of the window, and edges coated, just needs pilot holes and screwing in now.
 
Nearly a new man cave then soon be done at this rate,
 
Nearly a new man cave then soon be done at this rate,

Yep sure will be. Took this photo this mornings before going to work.
IMAG3366.jpg
I'm happy with its progress. Looking forward to doing more.
 
Well nipped home from work for 20mins. Wood was already cut and edges treated. So drilled pilot holes, screwed it on and gave it a coat of the good stuff.
IMAG3372.jpg
IMAG3370.jpg
 
Looking good Dan don't forget to have the topping out ceremony once the roof is finished (bad luck if you don't )
 
Looking good Dan don't forget to have the topping out ceremony once the roof is finished (bad luck if you don't )
'topping out ceremony' what does that involve? If it involves sheep I will have to contact Darren.

Chris I have your club clothing. Are you going to the mustang club on the first Sunday of November? If so I could pop down there.
 
Did someone mention sheep? Fecking loads around here at the moment,

you build a BBQ should be a good one if this thred build is anything to go by then we can throw some LAMB stakes on the BBQ.:hungry:
 
Topping out is a celebration party that the roof is finished nice bottle of bubbly or a pint will cover it lol.And just hoping to have the wheels back buy the 5th for the black horse meet and the mustang meet at cams on the Sunday. Must sort out the web site stuff for you as well Dan.bit posh for a sheep shed???
 
Back
Top